Non Infill Grass
86-510-85124101
BUSINESS EMAIL
Get a Free Sample Kit
info@vivaturf.com
  • HOME
  • About Us
    • Company
  • NEWS
    • company news
  • Artificial Turf
    • Kindergarten Turf Series
    • Multifunctional Turf Series
    • Customized Turf Series
    • Non infill football grass
    • Football Artificial Turf System
    • Landscaping Turf Series
  • Case
    • project
  • Contact us

company news

Home- company news

Does Non-Infill Artificial Turf Need to Be Pre-Laid Before Installation?

Does non-infill artificial turf need to be pre-laid before installation? In most professional installations, pre-laying—also called relaxation, conditioning, or unrolling—is a recommended preparation step. It allows the turf roll to relax after transportation and storage, helps the backing and synthetic fibers adapt to the installation environment, and can reduce the likelihood of wrinkles, ripples, and joint tension after installation.

However, pre-laying should not be treated as a substitute for proper sub-base preparation or professional installation. The recommended relaxation time and installation conditions can vary depending on turf construction, backing system, transportation conditions, ambient temperature, humidity, and the manufacturer's installation instructions.

For premium non-infill artificial turf systems, the combination of material stability, pre-laying, correct tension management, accurate cutting, and professional seam installation is generally more important than any single installation parameter.

Why Does Non-Infill Artificial Turf Need to Be Pre-Laid?

Non-infill artificial turf differs from conventional infill systems because it is designed to provide performance without relying on sand or rubber granules as loose ballast. This makes the dimensional stability of the turf system and the quality of installation particularly important.

Pre-laying mainly serves three purposes.

1. Pre-Laying Helps Release Transportation Stress

Artificial turf is normally manufactured and transported in rolls. During rolling, handling, loading, and transportation, the backing and synthetic fibers remain curved for an extended period.

When a turf roll is immediately cut and seamed after being unrolled, some residual curvature or internal stress may still be present.

After installation, this stress can gradually be released and may contribute to:

  • Minor ripples
  • Localized wrinkles
  • Edge lifting
  • Uneven seams
  • Surface undulations

Allowing the turf to relax before final cutting and bonding gives the material time to recover naturally.

This is particularly relevant for long turf rolls and projects where the material has experienced extended transportation or storage.


2. Pre-Laying Allows the Turf to Adapt to Ambient Temperature

Most artificial turf fibers and backing materials are polymer-based, commonly incorporating PE, PP, or related polymer systems.

Like other polymer products, artificial turf can experience dimensional changes as temperature changes.

For example, turf transported in a relatively cool environment may expand after being exposed to warmer installation conditions. If the material is immediately cut and permanently fixed before reaching a more stable condition, additional stress may develop around seams and perimeter areas.

Pre-laying allows installers to assess the turf after it has adjusted to the actual site conditions.

This makes the final cutting dimensions more representative of the turf's installation state.


3. Pre-Laying Helps Synthetic Fibers Recover Their Appearance

Transportation can temporarily flatten or bend synthetic fibers.

After the turf is unrolled and left in a relaxed position, the fibers can gradually recover their intended orientation.

For non-infill systems using straight and curled fibers to create self-supporting performance, this recovery can be particularly useful.

The basic process is therefore:

Unroll → Relax → Inspect → Align → Cut → Seam → Secure

Rather than:

Unroll → Immediately Cut → Immediately Glue


How Long Should Non-Infill Artificial Turf Be Pre-Laid?

There is no single relaxation period that applies to every artificial turf product.

A practical reference for many projects is shown below:

Ambient ConditionsTypical Relaxation ApproachKey Consideration
Above 30°C / 86°FSeveral hours to approximately 24 hoursAvoid unnecessary prolonged direct solar exposure
15–30°C / 59–86°FAround 24 hoursCommon installation range
5–15°C / 41–59°FApproximately 24–48 hoursAllow additional recovery time
Below 5°C / 41°FInstallation should be carefully evaluatedFollow product-specific requirements

These figures should be regarded as practical installation guidance rather than universal certification requirements.

For turf that has experienced long-distance transportation, extended storage, or significant temperature changes, a longer relaxation period may be appropriate.

Instead of focusing only on the number of hours, installers should evaluate whether:

  • Major wrinkles have relaxed;
  • The backing lies relatively flat;
  • The turf dimensions are stable;
  • Fiber orientation has recovered;
  • The material is suitable for final cutting and seaming.

The manufacturer's technical installation instructions should take precedence where they specify different requirements.


How to Pre-Lay Non-Infill Artificial Turf Correctly

Step 1: Inspect the Sub-Base Before Unrolling

Pre-laying should begin only after the installation area has been properly prepared.

The sub-base should be checked for:

  • Surface flatness
  • Compaction
  • Drainage
  • Standing water
  • Loose aggregate
  • Sharp objects
  • Localized depressions or high spots

For sports applications, the finished base should normally be designed and verified according to the requirements of the relevant sports facility and synthetic turf system.

A practical tolerance sometimes used for artificial turf installation is approximately ≤5 mm over a 3 m straightedge, although project specifications may require tighter tolerances.

The key principle is simple:

Pre-laying cannot correct a defective sub-base.

If the foundation contains significant depressions or high spots, these defects may remain visible after the turf is installed.


Step 2: Unroll the Turf in the Correct Direction

The turf should be unrolled according to the planned fiber direction.

All rolls within the same visible playing or landscape area should be aligned consistently.

This is particularly important because synthetic fibers can reflect light differently depending on their orientation.

Incorrect alignment may produce a visible difference between adjacent rolls, sometimes described as a shading or “directional” effect.

Before cutting, installers should therefore confirm:

  • Fiber direction
  • Roll sequence
  • Seam location
  • Field markings
  • Color and batch consistency

Step 3: Allow the Turf to Relax Naturally

Once unrolled, the turf should be allowed to relax without excessive stretching.

Installers should avoid attempting to force the material completely flat by aggressively pulling it.

Excessive tension can create unnecessary stress within the backing and seams.

A better approach is:

Unroll → Allow natural relaxation → Inspect → Make controlled adjustments

rather than aggressively stretching the entire roll.


Step 4: Perform Final Cutting After Relaxation

Final cutting is preferably performed after the turf has had adequate time to relax.

This helps reduce the possibility of:

  • Oversized or undersized seams;
  • Excessive seam tension;
  • Insufficient perimeter material;
  • Uneven roll alignment;
  • Repeated cutting and adjustment.

For perimeter areas, installers should normally maintain sufficient material allowance for final trimming.

The exact allowance should follow the turf manufacturer's installation specification rather than applying a single universal dimension to every product.


What Installation Conditions Are Recommended?

The installation environment can significantly influence the behavior of artificial turf and adhesive systems.

For many synthetic turf projects, installers aim for moderate ambient conditions, often around:

15–30°C / 59–86°F

However, the acceptable range depends on the backing system, adhesive, sub-base and manufacturer's technical requirements.

Other important considerations include:

Surface Condition

The sub-base should be clean, stable and free from standing water.

Humidity

Relative humidity should remain within the adhesive manufacturer's recommended range.

Wind

Strong winds can make large turf rolls difficult to control and can affect seam alignment and adhesive application.

Rain

Seaming and adhesive bonding should generally be avoided when the backing or sub-base is wet unless the adhesive system has specifically been designed and approved for such conditions.


Common Mistakes When Pre-Laying Non-Infill Artificial Turf

Mistake 1: Skipping the Relaxation Process

Trying to save several hours during installation may increase the risk of having to correct wrinkles or seam alignment later.

For large sports fields, correcting an improperly installed seam can be considerably more complicated than allowing sufficient relaxation time beforehand.


Mistake 2: Treating Direct Sunlight as a Fast Relaxation Method

Heat can accelerate material relaxation, but excessive solar exposure can also raise turf surface temperatures significantly.

A better strategy is controlled exposure under appropriate site conditions rather than deliberately overheating the turf.


Mistake 3: Stretching the Turf Too Aggressively

Artificial turf should be installed flat and correctly tensioned, but excessive mechanical stretching is not necessarily beneficial.

The objective should be controlled alignment and tension management, not maximum stretching force.


Mistake 4: Ignoring the Seam System

Pre-laying does not eliminate the need for professional seam construction.

Seam quality depends on factors such as:

  • Seam tape selection
  • Adhesive compatibility
  • Adhesive application
  • Open time
  • Pressure
  • Curing conditions
  • Fiber alignment

The adhesive manufacturer's technical data sheet and the turf manufacturer's installation manual should be followed.


Mistake 5: Assuming Pre-Laying Can Fix Every Wrinkle

If substantial wrinkles remain after adequate relaxation, installers should investigate the underlying cause.

Potential causes may include:

  • Uneven sub-base;
  • Excessive installation tension;
  • Incorrect seam alignment;
  • Backing deformation;
  • Temperature-related dimensional movement;
  • Improper storage;
  • Product-specific dimensional stability issues.

Simply adding more relaxation time may not resolve a structural installation problem.


How Does Pre-Laying Affect Non-Infill Turf Performance?

The purpose of pre-laying is not simply cosmetic.

It contributes to the overall installation process by helping stabilize the turf before permanent fixing.

A properly conditioned turf system can make it easier to achieve:

Better Surface Flatness

Reduced temporary wrinkles can improve the appearance of the completed installation.

More Consistent Seams

When the turf has relaxed before cutting, installers can more accurately control seam alignment.

More Predictable Installation Dimensions

The final cutting dimensions can be based on the material's condition at the actual installation site.

Better Fiber Presentation

Allowing the fibers to recover naturally can improve the finished visual appearance.

For non-infill applications, these factors are especially relevant because the system does not depend on loose infill to provide additional ballast.


What Makes a High-Quality Non-Infill Artificial Turf System?

Pre-laying is only one part of the installation process.

A high-quality non-infill system should ideally be evaluated across several dimensions:

Key FactorWhat to Evaluate
Fiber materialPolymer quality, resilience and UV stability
Fiber structureStraight/curled fiber configuration and recovery
BackingDimensional stability and mechanical strength
Adhesive systemCompatibility, bonding and environmental resistance
DrainagePermeability and drainage design
Seam systemSeam tape, adhesive and installation method
Environmental performanceRecyclability, material composition and emissions
Technical supportInstallation guidance and project support

This broader evaluation is generally more meaningful than comparing grass height or stitch density alone.


VivaTurf: Advancing Non-Infill Artificial Turf Technology in Europe, the Americas and Global Markets

As a specialist artificial turf brand, VivaTurf (Weiteng / 威腾体育) has increasingly developed its non-infill turf technology for international sports, landscape and recreational applications.

VivaTurf's market strategy focuses not only on turf appearance but also on material engineering, self-supporting fiber structures, backing stability, installation performance and environmental sustainability.

Its non-infill systems are designed around the concept of reducing reliance on loose infill materials while maintaining appropriate playing characteristics and surface stability.

This approach is particularly relevant to international markets where project owners increasingly consider:

  • Reduced loose-material management;
  • Simplified routine maintenance;
  • Material recyclability;
  • Environmental impact;
  • Long-term surface performance;
  • Installation consistency.

VivaTurf has expanded its international business across Europe, North America, Asia and other global markets, positioning the brand as a competitive Chinese manufacturer in the international non-infill artificial turf sector.

Environmental Innovation

One of VivaTurf's notable areas of development is its focus on recyclable turf construction.

The company's VRG non-infill system is designed around more compatible material structures to facilitate end-of-life recycling and reduce dependence on conventional sand and rubber infill.

This reflects a broader trend in the European and North American artificial turf markets toward circular materials, reduced waste and more sustainable field management.

For project owners evaluating sustainable synthetic turf, recyclability and end-of-life treatment are becoming increasingly important alongside conventional performance specifications.


VivaTurf Non-Infill Turf: Combining Performance, Sustainability and Installation Expertise

For customers looking for a non-infill artificial turf system, VivaTurf can be considered when the project requires a combination of self-supporting turf technology, stable backing construction, reduced maintenance requirements and environmental considerations.

VivaTurf's product development covers applications ranging from sports fields and training facilities to schools, commercial landscapes, residential gardens and recreational areas.

Its technical approach places emphasis on:

  • Self-supporting fiber structures;
  • Stable backing systems;
  • Professional seam solutions;
  • Improved dimensional stability;
  • Recyclable material concepts;
  • International quality requirements;
  • Project-specific installation guidance.

For international buyers, another important advantage is the ability to work with a manufacturer that understands both Chinese production capabilities and the technical expectations of overseas markets.

Rather than selecting artificial turf solely by price, buyers should evaluate the complete system—including fiber construction, backing, dimensional stability, drainage, seam performance, environmental characteristics and technical support.


Frequently Asked Questions About Pre-Laying Non-Infill Artificial Turf

Does non-infill artificial turf always need to be pre-laid?

Pre-laying is generally recommended for professional installations, particularly after transportation and long-term roll storage. However, the exact requirement should follow the manufacturer's installation instructions.

How long should artificial turf be pre-laid?

Around 24 hours is a common reference under moderate conditions, while colder temperatures or extended transportation may justify a longer relaxation period.

Can artificial turf be installed immediately after delivery?

It may be possible for certain products and controlled installation conditions, but immediate installation without adequate relaxation can increase installation risks. Checking the manufacturer's technical instructions is recommended.

Does pre-laying prevent wrinkles completely?

No. Pre-laying can reduce wrinkles associated with transportation and temporary material stress, but it cannot compensate for poor sub-base preparation, excessive installation tension or unsuitable turf construction.

Does garden non-infill turf also need pre-laying?

It is generally beneficial, especially for larger areas or turf supplied in tightly wound rolls. Smaller residential installations may require less conditioning time depending on the product and site conditions.


Does Non-Infill Artificial Turf Need to Be Pre-Laid Before Installation?

In most professional installations, pre-laying non-infill artificial turf is a recommended practice.

Its main purpose is to allow the turf to:

Relax after transportation → Adapt to site conditions → Recover fiber orientation → Stabilize before cutting → Improve seam installation

However, successful installation depends on more than relaxation time.

The best results generally come from combining:

Stable non-infill turf + properly prepared sub-base + adequate pre-laying + controlled installation tension + professional seam construction + appropriate maintenance.

For buyers looking for a globally oriented non-infill artificial turf supplier, VivaTurf is a brand worth considering for projects that place importance on technical performance, environmental responsibility and long-term installation quality.



Tags

non-infill artificial turf non-infill artificial grass non-infill turf does non-infill artificial turf need to be pre-lai artificial turf pre-laying artificial grass installation artificial turf installation guide artificial turf relaxation artificial grass installation guide non-infill football turf non-infill sports turf recyclable artificial turf eco-friendly artificial turf VivaTurf VivaTurf non-infill turf non-infill turf manufacturer artificial turf manufacturer sustainable artificial turf
time:2026-08-27

Products

Recent Post

  • Can Professional Football Pitc
  • Does Non-Infill Artificial Tur
  • How to Repair Damaged Seams in
  • How to Clean Stains from Non-I
  • What Daily Maintenance Does No
  • Can Non-Infill Artificial Turf
  • How to Choose the Right Grass
  • Does Artificial Turf Have Envi
  • How to Evaluate the Wear Resis
  • How to Prevent Non-Infill Arti
Footer Logo

VIVATURF Non Infill Artificial Turf

D-park,No.100 Dicui road, Wuxi City, P.R.China

Contact us

Quickly Links

  • About Us
  • NEWS
  • Artificial Turf
  • Case
  • Contact us

Business Hours

Mon - Fri: 7 a.m.to 16 p.m.
Saturday: 8 a.m to 12 p.m.

Friendly Links

  • ags turf
  • vivaturf
  • Non Infill Grass
  • hedef
  • FIFA
info@vivaturf.com
Call Us On
86-510-85124101
We Are Social
Copyrights © 2025 VIVATURF Non Infill Artificial Turf. All rights reserved. SiteMap
×
  • HOME
  • About Us
    • Company
  • NEWS
    • company news
  • Artificial Turf
    • Kindergarten Turf Series
    • Multifunctional Turf Series
    • Customized Turf Series
    • Non infill football grass
    • Football Artificial Turf System
    • Landscaping Turf Series
  • Case
    • project
  • Contact us